ALARM RATIONALISATION /

PROJECT SUMMARY

Implement alarm improvement works at 9 sites for a tier-1 miner, achieving a 300% reduction in operator alarms by applying subset filters.

SCOPE

/

Review site SCADA alarm priorities across the entire alarm database, categorising all alarms to a common standard across multiple sites. Worked with client equipment SMEs and plant controllers to review and apply consistent alarm classifications.

/

Optimise existing alarm dashboards by eliminating non-relevant alarms to improve operator visibility and reduce nuisance alerts. 

/

Develop a Power BI analytics dashboard to identify and monitor bad actor alarms based on frequency and impact metrics.

TECHNOLOGIES USED

/

Aveva Plant SCADA

/

Pi Historian

/

Wonderware System Platform SCADA

/

Wonderware Historian

/

EcoStruxure Control Expert

/

Schneider PLC M340, M580, Quantum

/

Aveva Production Management (AMPLA)

PROJECT
DETAILS
Scroll to Top