Part of a de-bottlenecking project, the miner required deconstruction of the existing cake wash facility – wet processing, water circuits, screening, scrubbing and WHIMS.
Removal of legacy PLC logic and associated control sequences, followed by network re-patching to optimise communication pathways and maintain system integrity.
Update functional specifications to reflect revised operational requirements and developed a formal PLC/SCADA decommissioning plan.
Produce detailed test documentation for validation of system changes and red-lined electrical and communication drawings to capture as-bult conditions.
Manage the entire process under a strict Management of Change (MOC) framework to ensure traceability and risk mitigation.
Conducted a CHAZOP to review to identify and address potential hazards in the revised control strategy.
Completed onsite commissioning, including verification of hardware, software and network configurations.
Onsite commissioning.
Rockwell PlantPAx System
Rockwell ControlLogix PLC
Rockwell FactoryTalk View SCADA
Rockwell Historian
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions. View our “Cookie Policy” and “Privacy Policy” for more information.